What you receive
A yield estimate you can hold us to, a bill of materials, and the approval route with realistic timelines.
Survey · Engineering · Execution · O&M
Every project runs through the same four stages, in the same order. Nothing is skipped to hit a price, and nothing is handed to a third party we cannot stand behind. Here is exactly what happens, and who does it.
Stage 01
Before anything is quoted, we establish whether the site can actually produce what you are being promised — and whether the paperwork will allow it.
A yield estimate you can hold us to, a bill of materials, and the approval route with realistic timelines.
Most underperforming plants in this region were undersized, over-shaded or wrongly approved — all of which are decided at this stage.
Stage 02
The detailed design, and then the buying. Because we do both, the design is not quietly compromised later to match whatever material was cheapest that month.
Stage 03
The stage where most timelines slip. Ours is run as a managed construction project with a schedule you can see, not as a delivery of boxes followed by a scramble.
Site handover, material staging, structure marking and foundation work begin.
Mounting structure completed, modules laid and clamped, DC strings dressed and tested.
Inverters, combiner boxes, earthing, lightning arrest and AC cabling to the metering point.
Inspection, net meter, first generation report, and the documentation set for your records.
Stage 04
A solar plant is a twenty-five year asset, and it quietly loses output every year it is left alone. Our O&M keeps the generation curve where the design said it would be.
Generation is checked against the expected yield for that day and that weather. A drop gets investigated, it does not get averaged away over the month.
Scheduled inspection of connections, protection devices, earthing and structure — before a loose termination becomes a burnt one.
We hold the manufacturer warranty paperwork and pursue module and inverter claims on your behalf, which is the part owners almost never win alone.
Dust in this region is the single largest recoverable loss. Cleaning is scheduled by season, not by complaint.
Our people are trained on safety, performance and quality — the three things that decide whether a plant lasts its full life.
The same team that built the plant maintains it. Nothing gets lost in a handover to a subcontractor you have never met.
Process questions
Site survey and feasibility take a few days. Statutory approval is the variable — it depends on the DISCOM and your sanctioned load. Once material is on site, a residential rooftop is typically commissioned inside a month; commercial and industrial plants scale with the size of the array.
Yes. NOC, design approval, inspection and the net meter itself are part of our scope. We prepare the drawings the DISCOM asks for and follow the file through to commissioning approval.
You get the documentation set, the warranty papers and a first generation report. From there our O&M covers monitoring, preventative maintenance, washing and warranty claims for as long as you want us on it.
Balaghat · Madhya Pradesh
Send us your last electricity bill and the roof or land you have in mind. We will come back with a system size, a generation estimate and a written quotation — no obligation.